Purva Trivante Address
Purva Trivante spreads across two neighbouring villages, S. Medahalli and Adigarakallahalli, in Sarjapura Hobli, Anekal Taluk.
| Address detail | Purva Trivante |
|---|---|
| Villages | S. Medahalli and Adigarakallahalli |
| Hobli and taluk | Sarjapura Hobli, Anekal Taluk |
| District and PIN | Bengaluru Urban 562125 |
| Main road access | Sarjapur-Attibele Road (SH-35), about 1.8 km by road |
| Road frontage | an existing 12 m road along the northern edge |
| K-RERA registration | PRM/KA/RERA/1251/308/PR/210324/006719, registered as Purva Kensho Hills |
You may also see the village spelt S. Medihalli, the spelling Puravankara uses. It is the same place, registered as S. Medahalli.
The layout fronts an existing 12 m road along its northern edge, shown on the approved plan as a proposed master-plan road. The internal roads, parks and clubhouse site are set out on the master plan; ask to see the entrance position on the ground when you visit.
For your lawyer, the survey numbers are Adigarakallahalli Sy. 110/1-4 and 120/1-3, and S. Medahalli Sy. 206/9, 206/10, 206/12, 207/1-7, 208/1-5, 209/1-5, 210/2, 211/1, 212/1-4 and 213/1. Match them against the schedule of your agreement for sale and against the K-RERA registration above.
Purva Trivante Road Connectivity
Purva Trivante reaches the wider city through the Sarjapur-Attibele Road (SH-35), an existing two-lane state highway about 1.8 km by road from the layout. Sarjapura town centre is about 4.5 km to the north by road, and Attibele about 8 km to the south-west, where the Hosur Road (NH-44) check post is about 8.7 km away.
| From Purva Trivante to | By road |
|---|---|
| Sarjapur-Attibele Road (SH-35) | about 1.8 km |
| STRR (NH-648) at Sarjapura - section under construction | about 4.4 km |
| Sarjapura town centre | about 4.5 km |
| Attibele bus stand | about 8.0 km |
| Attibele, NH-44 (Hosur Road) check post | about 8.7 km |
| Dommasandra Circle | about 9.0 km |
| Chandapura | about 15.2 km |
| Hosur bus stand (Tamil Nadu) | about 16.6 km |
| ORR-Sarjapur Road junction (Iblur) | about 20.3 km |
| Kempegowda International Airport | about 57 km |
The Satellite Town Ring Road (STRR, NH-648) section from Hoskote to the Tamil Nadu border runs through Sarjapura, about 4.4 km by road from the layout. It is under construction; completion targeted for November 2026. Until it opens, plan every journey on the roads in use today.
Kempegowda International Airport is about 57 km by road on roads open today, by way of Sarjapura, Varthur, Whitefield and Hoskote.